Documents

Full catalogue of deliverables. Demo. No invented client names or certifications.

Project Intake

Project intake: what must exist before generation. Gaps stay TBC.

  • Project charter (Demo)

    Package name, type, jurisdiction, language. No invented client data.

  • Stakeholder register

    Roles TBC until the Contractor/Employer list is issued.

  • Site information request

    Which survey / GI / bathymetry must be attached.

  • Kick-off agenda

    Document-control points, not an invented construction programme.

  • Document control procedure

    Revisions, transmittal, Issued vs Draft status.

  • Required deliverables list

    Ticked in the wizard; quantities are not filled in.

Tender

Tender pack — heading-level. Prices, productivities and quantities stay TBC without a BOQ/source.

  • Tender cover (Demo)

    Package identification. No market price.

  • Tender Method Statement outline

    Sequence as headings. Durations TBC.

  • Programme narrative

    No invented days. Marked not-final if productivities are missing.

  • Tender risk register

    Risks as questions, not scores copied from another project.

  • Clarification / tender RFI log

    Links gaps to questions for the Employer.

  • BOQ cover

    Heading lines. Quantities TBC until take-off from drawings.

Method / HSE

MS, RAMS, PTW, lifting, diving. Labelled DRAFT/TBC. Does not authorise work.

  • Method Statement

    Sequence, plant, crew — TBC until a source.

  • RAMS / HIRA

    No copied residual scores. Does not authorise work.

  • Permit to Work (form)

    Blank until the site procedure exists.

  • Lifting plan

    Radii, SWL, weights TBC. Not an authorisation.

  • Diving plan (marine)

    Depths, gas, chamber TBC. Not an authorisation.

  • Emergency plan / ERP

    Contact numbers stay {{TELEFON}} / TBC.

  • Toolbox talk

    Topic and attendance blank.

QA/QC

ITP, MIR, NCR, submittal, inspections. Acceptance criteria stay TBC without a spec.

  • Inspection and Test Plan (ITP)

    Hold/Witness TBC until the QC procedure.

  • Material Inspection Request (MIR)

    Grade/class TBC without spec + certificate.

  • Nonconformance Report (NCR)

    Blank form — Opio does not inspect the works.

  • Material submittal

    No cousin product. Only the data sheet in hand.

  • Inspection request

    No invented survey results.

  • Hold-point schedule

    Extract from ITP. Notice period TBC.

Daily

Daily reports. Weather, tide, productivity — TBC without a site diary.

  • Daily Progress Report

    Daily quantities TBC. Do not copy another site.

  • Site diary

    Events blank until human completion.

  • Weather / tide log

    Values TBC. Do not invent tide tables.

  • Labour / plant return

    Names and hours TBC.

  • Photo log

    Points to uploaded files, not client photographs.

Suppliers

No invented supplier names or certifications. Register structure only.

  • Supplier register

    Rows TBC. Real companies are not filled in.

  • Material submittal tracker

    Status Draft / Needs Input.

  • Delivery inspection

    Links MIR. Quantity from the delivery note, not take-off.

  • Certificate of conformity checklist

    Blank fields until the PDF in hand.

Handover

As-built and handover. Levels and spare lists missing — TBC + source required.

  • As-built register

    Drawings and revisions TBC until transmittal.

  • O&M manual cover

    Content TBC without equipment data.

  • Punch list / snagging

    Blank form.

  • Draft taking-over certificate

    Not an issued certificate. Status Draft.

  • Spare parts list

    TBC until the manufacturer list in hand.